Our capabilities

Integrated expertise.
One delivery platform.

Comprehensive support across the project lifecycle—from early engineering and fabrication to site execution, commissioning and ongoing asset care.

Engineering team working with a detailed industrial model

01 / Engineering capabilities

Practical engineering for safe, constructible projects.

  • Front-End Engineering Design (FEED)
  • Detailed engineering and design
  • BIM and 3D modelling
  • Preparation of control philosophy and narrative
  • Process design and process engineering support
  • Equipment section, Sizing, Analysis and Calculations
  • Design and detailing of piping, structures, skids, modules and tanks
  • Specialized engineering studies including FEA and CFD
  • Flare-system network development
  • Flow-assurance studies
  • Industrial automation systems

02 / Workshop fabrication

Controlled fabrication across diverse materials.

Project-specific fabrication of structural steel, piping spools, modules, skids, shop-fabricated storage tanks and other specialized items.

Carbon steelStainless steelLow, high & super alloysCement-lined pipingNon-ferrous materialsNon-metallic piping
Industrial workshop welding and fabrication
Industrial piping installation at a process facility

03 / Site works—mechanical

Coordinated installation, testing and handover.

Piping & structures

Metallic and non-metallic piping erection, spool installation, welding, structural erection, alignment, testing and final handover.

Equipment & modules

Static and rotating equipment erection, alignment and testing, plus module and skid installation and pre-commissioning.

Storage tanks

Field construction, inspection, testing, pre-commissioning, box-up and handover.

Electrical testing inside an industrial control panel

04 / Electrical & instrumentation

Installation, verification and start-up support.

Electrical works

  • Switchgear, MCCs, transformers, substations and distribution boards
  • Electrical motors: installation, testing, commissioning, troubleshooting and maintenance
  • Power and control cable laying, glanding, termination, testing and identification
  • Normal, emergency and hazardous-area lighting systems
  • Equipment grounding and earth grids
  • UPS and battery systems
  • Protective relays, circuit breakers and overload protection
  • Inspection, Megger, continuity and functional testing
  • Electrical commissioning and start-up support

Instrumentation & control

  • Cable trays, cable pulling, glanding and termination
  • Junction boxes, tubing and control panels
  • Instrument calibration, configuration and loop checking
  • Insulation-resistance and functional testing
  • Control and shutdown valve testing
  • PLC/DCS I/O testing
  • ESD/SIS and Fire & Gas system testing
  • Cause & Effect verification and Site Acceptance Testing
  • Troubleshooting during commissioning and start-up
Heat exchanger maintenance at an industrial facility

05 / Shutdowns, turnarounds & maintenance

Restoring integrity with minimum disruption.

BLUPEAK performs blinding, cleaning, integrity inspection, repair, refurbishment, testing and box-up for equipment and piping systems.

Facilities supported

  • Full oil & gas process and utility units
  • FCC and RFCC units
  • Petrochemical process and utility units
  • Storage tanks and terminals
  • Pipeline networks
  • Steel, power and water industries

Equipment handled

  • Heat exchangers, coolers and condensers
  • Vessels, silos, drums, columns and towers
  • Heaters, boilers and steam generators
  • Filters, strainers, separators and slug catchers
  • Reactors, regenerators and catalytic converters
  • Flares, stacks, furnaces, kilns and conveyors
  • Piping tie-ins, repairs and refurbishment

06 / Manpower secondment

The right people, mobilized for the assignment.

  • Skilled personnel for unit isolation, draining, gas-freeing and support activities
  • Project management and project-support professionals
  • Semi-skilled and direct workforce deployment
  • Supply-chain and procurement personnel
Project and site personnel collaborating
PTFE and PFA lined industrial valves

07 / PTFE & PFA systems

Corrosion-resistant solutions for demanding service.

  • PTFE/PFA-lined piping, pipe spools and fittings
  • Lined filters, strainers and process vessels
  • Lined columns, tanks, scrubbers and reactors
  • Lined metallic bellows and manual valves
  • Specialized and custom-engineered lined products

08 / Supply chain management

Material control from sourcing to site delivery.

  • Project materials, LLI equipment and consumables
  • Supplier identification and prequalification
  • RFQs, evaluations and purchase-order support
  • Expediting and delivery monitoring
  • Freight, transport and customs coordination
  • Receiving, inspection and traceability
  • Warehousing, preservation and inventory control
  • Material tracking and schedule reporting
  • Support for shutdown, turnaround and urgent procurement requirements
Industrial supply chain and warehouse management
Industrial project planning and management

09 / Project management & consulting

Coordinated leadership across every project interface.

  • Project management and execution support
  • Engineering and technical consulting
  • Planning, scheduling and project controls
  • Procurement and contract management
  • Construction and site management
  • Project coordination and interface management
  • QA/QC and HSE management support
  • Commissioning and start-up support
  • Technical advisory and performance monitoring

10 / Specialized technical & industrial services

Specialist capability for complex field requirements.

  • FCC/RFCC refractory hex-mesh and refractory-anchor welding
  • Installation of specialized anchoring systems, including coke anchors for reactors and regenerators
  • Installation, alignment and replacement of metallic and non-metallic bellows
  • Specialized pipe supports including spring hangers, hydraulic snubbers and stoppers
  • Specialized rigging by skilled and experienced teams
  • Design, fabrication and installation of temporary supports for repair and partial replacement
  • Hydrostatic testing and integrity checks of piping systems and equipment
  • Rigging, transportation, installation and alignment of pumps, valves and rotating equipment following specialist-vendor overhaul
Specialized industrial technical services

Need a coordinated solution?

Let’s define the right scope for your project.